Case Study

Bridge installation and removal

The Challenge:

To undertake the contract lift and site management of the installation a new road bridge and remove the old bridge in a highly constrained site bounded by a railway, a river and a road.

To add to the challenge the crane build, both lifts and demob to be completed over a bank holiday weekend with 24 hour working.

The Result:

Completed safely, on time and on budget. A great example of lift engineering, site management and team work both in Osprey and with our client.