• 4 Transition Pieces Transported Vertically on Barge
  • 6 Transition Pieces vertical on Barge
  • Positioning on Barge

Wind Farm Transition Pieces

Osprey were one of the first contractors in Europe to carry TP’s vertical for marine shipment. Saving the need for up-ending at the destination port. This method is now the standard for TP shipments.

  • Provision of transport Barges and Tugs

  • Operational management of shipments

  • Design & Fabrication of suitable seafastening bases

  • Transport direct to installation vessel if required

  • All documentation and marine warranty requirements met