Wind Farm Transition Pieces
Osprey were one of the first contractors in Europe to carry TP’s vertical for marine shipment. Saving the need for up-ending at the destination port. This method is now the standard for TP shipments.
Provision of transport Barges and Tugs
Operational management of shipments
Design & Fabrication of suitable seafastening bases
Transport direct to installation vessel if required
All documentation and marine warranty requirements met



